App Icon
Create and modify a planning schedule for project management in a spreadsheet with WBS work breakdown and Gantt time chart.
商店資訊更新日期:2021年10月12日
適用裝置:
714,385
總覽
This free add-on helps you to create and modify a project schedule in a spreadsheet fast and accurately using a WBS work breakdown structure of tasks and start and finish dates per task. The Gantt chart can be set to show the project schedule for the range of weeks you like. During project execution, options for progress indication give color alerts in the schedule or Gantt for progress and delay. The add-on is available in several languages or a language can be requested.

The in-app PRO version adds resource assignment, cost calculation, scheduling with task duration and chaining of tasks to ProjectSheet, which help you in calculating and selling your project. The scheduling takes weekends and holidays into account.

The add-on requires some basic knowledge of project management, like the meaning of the terms used in this description.

A Work Breakdown Structure gives an overview of the tasks which fulfill the project scope. This add-on helps you with:
- Increase/decrease the task level
- Create summary tasks and milestones
- Collapse/expand summary tasks

The generated Gantt chart gives an overview of the timing of the tasks:
- Shift part or entire schedule in time
- Shift start date of the Gantt chart
- Change scale of the Gantt chart
- Indicate today's date in the chart
- Start day of period can be set to Sunday or Monday

Progress tracking during project execution:
- Indicate progress per task as a percentage
- Summary tasks are calculated
- Color indication of progress status per task relative to current date

PRO version:

Resource assignment:
- Assign resources to task
- Both work (per hour) and material (per unit) resources
- Overall addition per resource in Resource sheet

Budget calculation:
- Each resource can have a cost rate per unit
- ProjectSheet calculates per task the cost based on its assigned resources
- Summary tasks calculate cost based on its sub-tasks
- ProjectSheet calculates per resource the cost based on all the tasks

Enter task duration:
- Finish date will follow start date and task duration
- Task duration will follow change in finish date
- Start day and length of working week can be adjusted per document
- Weekends and holidays will be skipped

Chain tasks:
- Subsequent tasks on the same WBS level can be linked like a waterfall
- Summary tasks on same WBS level can be chained
- Subtasks will follow summary task or can be set to a fixed date
其他資訊
定價未提供
ProjectSheet planning 將會要求下方所示的權限。瞭解詳情
ProjectSheet planning 將需要存取您的 Google 帳戶
這項操作將授予「ProjectSheet planning」下列權限:
查看及管理已安裝這個應用程式的試算表
在 Google 應用程式內的提示和側欄中顯示及刊登第三方網頁內容
連線至外部服務
允許這個應用程式在未受您監控的狀態下自動執行
查看您的主要 Google 帳戶電子郵件地址
查看您的個人資訊,包括您已公開的任何個人資訊
評論
語言:
排序依據:
Profile Picture
「ProjectSheet planning」的使用者
2019年10月4日
Very very helpful!
這則評論對您有幫助嗎?
Profile Picture
「ProjectSheet planning」的使用者
2019年12月14日
I am just a light user for a project management tool. And ProjectSheet planning helps me a lot on managing my tasks. this is a easy to use tool, and you are looking for something basic, this is it.
這則評論對您有幫助嗎?
Profile Picture
Divine Chao
2021年5月4日
覺得很好 可以讓我安排專案進度管理
這則評論對您有幫助嗎?
Profile Picture
Ricky Teacher
2020年7月24日
難用到爆 自由度低 垃圾
這則評論對您有幫助嗎?
Profile Picture
「ProjectSheet planning」的使用者
2020年5月19日
The sidebar is not responding, otherwise it will be a very useful tool.
這則評論對您有幫助嗎?
1-5 / 5
搜尋
清除搜尋內容
關閉搜尋
Google 應用程式
主選單